How to Use EPA e-Manifest: A Step-by-Step Guide for Generators

TL;DR for EHS managers: e-Manifest is EPA's national system for hazardous waste manifests, inside RCRAInfo.
Since January 22, 2025, any producer of waste must keep an account with Site Manager or Certifier permissions (EPA).
To use it properly: register two Site Managers per EPA ID, agree with your hauler and TSDF who creates the manifest, sign electronically when every party can, and check every shipment before your exception deadline.
Step 1: Register
- Create an industry account in RCRAInfo; identity is secured through Login.gov.
- Confirm your site's EPA ID (or file Form 8700-12, often via myRCRAid).
- Request Site Manager access; EPA encourages at least two Site Managers per EPA ID (EPA). Until the first one exists, EPA or the state approves requests.
- Site Managers then grant Viewer, Preparer or Certifier permissions and manage API keys.
If your only Site Manager has left, you must ask EPA or your state to approve a new one. Plan for it.
Step 2: Decide who creates the manifest
A transporter, broker or receiving facility can prepare a manifest on your behalf. We advise agreeing upfront on who creates manifests to avoid duplicates. When you create one yourself, generator data is pre-filled and the screen shows whether your site can e-sign; the manifest can be set to Scheduled only if the receiving facility allows it.
Step 3: Sign
- Quick Sign: available to Preparers, for initial receipt of shipments by generators, transporters and receiving facilities.
- CROMERR signature: required for final submission by the receiving facility and for post-receipt corrections; it needs stronger identity proofing (EPA FAQ).
- All or nothing: a generator can e-sign only if every handler on the manifest can sign electronically.
- Hybrid: if nobody can e-sign at pickup, the manifest switches to hybrid; generator and initial transporter sign a printed copy, the rest sign electronically (RCRAInfo help).
- Remote signers: since May 2023, a registered colleague or your own system via the API can execute the signature for field staff (EPA policy).
- DOT still requires a paper copy over the road; print it on letter paper.
Step 4: Track returns and fix errors
- Receiving facilities no longer mail you the final copy: log in and look.
- Under 40 CFR 262.42, an waste producer contacts the transporter and facility if no signed copy is available within 35 days and files an exception report at 45 days (for large quantities) or 60 days (for small quantifies). Exception reports go through e-Manifest since December 1, 2025.
- Corrections are electronic; Certifiers and Site Managers submit them.
- Management code H141 is retired on January 1, 2027, replaced by S-codes.
What it costs
Generators pay no user fee; receiving facilities do.
For shipments initiated October 1, 2025 to September 30, 2027: $5 per electronic or hybrid manifest, $7 data plus image, $25 scanned image.
Expect TSDFs to pass the paper premium on, and see EPA's proposed paper sunset rule.
[[button-1]]
Where Wastetide fits
Generating manifests can be painful, so we created the Wastescan solution: you can generate an e-manifest from a smparthone picture. Just download the Wastescan app from Playstore and start playing around.
But a manifest only proves where the waste went, while the invoice says what you paid. Wastetide reconciles manifests, invoices and contracts per site and stream (automated, compliant data), flags overcharges (invoice audit) and spots materials that could be sold instead of shipped as hazardous (material identification).
[[button-2]]
FAQ
Who must register for e-Manifest?
LQGs and SQGs since January 22, 2025, plus transporters, receiving facilities and exporters. VSQGs and PCB generators are not required to register federally.
What is the difference between Quick Sign and Sign?
Quick Sign, available to Preparers, covers initial receipt signatures. The CROMERR signature, for Certifiers and Site Managers, is required for final facility submission and corrections.
Do generators pay e-Manifest fees?
No. EPA charges receiving facilities per manifest: $5 electronic, $7 data plus image, $25 scanned image in FY2026-2027.
Do drivers still need paper?
Yes. DOT requires a physical copy to accompany the shipment; it can be printed from e-Manifest.
Informational, not legal advice.
You may like
Turn waste into opportunity.
Hack the flow.
Join Wastetide.
At Wastetide, we turn discarded materials into new possibilities.
We combine responsible sourcing and bold design to transform waste into meaningful, sustainable value.
